Water is taken from the regulator facility located in the dungeon strait of Aksu district of Isparta Province and reaches the loading pool located at the pine road route by the 'V' type water channel and the Aksu Eğirdir road route. The net dream of our plant is 214 m. and its installed capacity is 16 MW.