0 (246) 232 60 44
USD: 32.3004   E: 35.0419

Senirce-1

  • DCIM100MEDIADJI_0176.JPG
  • DCIM100MEDIADJI_0171.JPG
  • DCIM100MEDIADJI_0169.JPG

information

Within the scope of the Unlicensed Electricity Generation in the electricity market, the electricity production started on 23.02.2017 at our plant in Senirce Village of Gönen District of Isparta Province. The installed capacity of our power plant is 1 MW.

Date

27 September 2014

CATEGORY

project-plant

Aksu Energy Inc.

http: // #